Background
It’s the summer holidays, and at WCCL, we are busy, busy, busy on school projects at the moment.
As you may be aware, schools, academies, colleges, and other educational institutions will often arrange for construction and building works outside of term time. This is to create as little disruption as possible and keep risks to staff and pupils at a minimum.
At Wilkinson Construction Consultants, we have worked with over 100 schools, academies, and colleges across London and the south east from minor alterations to new or replacement buildings.
In this article, we will examine the Building Regulations for schools and other academic institutions, including the need for more SEN provision, the need to replace RAAC (reinforced autoclaved aerated concrete), Building Bulletin 100 fire safety in schools and modern methods of construction.
Building Regulations Relating to Schools and Colleges
SEND provision
In March 2024, the Government announced an investment of £850 million to create new places for young people with Special Educational Needs and Disabilities (SEND) and in Alternative Provision (AP) in mainstream and special schools and to improve the accessibility of existing buildings.
This will provide specialist support for children with autism, learning difficulties, mobility difficulties and more to meet their extra needs, including extra encouragement in their learning, help communicating with other children and support with physical or personal care difficulties, such as using the toilet or getting around the school safely.
Additionally, schools and sixth form colleges will benefit from £1.8 billion in funding to help maintain their buildings. This funding will support schools in investing in projects like refurbishing classrooms, improving playgrounds, and installing new windows, as well as larger projects such as upgrading heating systems, replacing roofs or rewiring electrical systems.
SEND Schools have their own guidelines in Building Bulletin 102 Designing for disabled children and children with special educational needs.
At WCCL, we have worked on a number of such schemes, including Danecourt School, Northbury Primary and Riverside Junior School.

Northbury Primary School – Ludwig Willis Architects
RAAC in Schools
Recently, we have seen many educational establishments looking to replace Reinforced Autoclaved Aerated Concrete (RAAC) which was commonly used in schools and colleges in England between the 1950s and mid-1990s.
What is RAAC?
RAAC is created from a combination of cement, lime and aeration agent. Whilst it may initially look similar it is a cheaper alternative to traditional concrete. Its advantages are that it is swifter to produce and lighter and easier to install as it is aerated meaning it is bubbly, similar to an aero chocolate bar.
Where is RAAC commonly found?
RAAC was used in schools, colleges and other building construction from the 1950s until the mid-1990s. It may therefore be found in any school and college building (educational and ancillary) that was either built or modified in this time period. Where unsure of the date of construction and/or modification of buildings, it is advised to assess all buildings thought to be constructed between the mid-1950s and mid-1990s. RAAC ‘panels’ were and used for flat and pitched roofs, eaves, floors and walls within building construction.

RAAC Risks with Safety
When used for flat roofing, the RAAC frequently gets layered with materials such as bitumen roofing felt, which can, over time, fail, allowing the RAAC units to be exposed to moisture. The moisture permeates into the pervious material, exposing the embedded mild steel reinforcement to corrosive forces and causing the concrete to fail. Most of the buildings built using RAAC are long past their functional life expectancy, and without proper maintenance, it is possible for the RAAC units to collapse without warning. The Standing Committee on Structural Safety (SCOSS) flagged the issue of RAAC material not being safe back in 2019. RAAC becomes highly dangerous when unmanaged and unmonitored.
Typically, panels are hidden behind finishes (suspended ceilings or plasterboard) and, therefore, may be difficult to identify without minor intrusive works. Ceiling panels may need to be removed to inspect a roof or access may be required into loft voids. RAAC panels are usually (but not always) 450mm to 600mm wide and 2.4m to 3m long, although panels were available up to 6m in length. They typically have a slight chamfer to each edge. The colour varies from white to pale grey. In a roof, the easiest way to identify RAAC panels is to look at the underside.
What Should You Do If You Suspect RAAC Has Been Identified?
Once RAAC has been suspected or identified, a specialist Structural Engineering Consultant should be appointed to undertake a detailed assessment. To ensure consistency, the consultant should adopt a unified scope. The structural engineer will produce a report that includes a long-term strategy for remediation based on the risk profile. Any works to repair or replace RAAC are likely to require building control approval, and as the material is an uncommon form of construction, this should be overseen by a Class 3 Building Inspector.
Design for fire safety in schools
Fire safety within schools can be complex, and there may be many existing areas where the building doesn’t comply, as historically, many schools were exempt from building regulations until 2001. Instead, approval was sought through the DETR and (DfEE), but these bodies had similar but differing requirements that they applied, and it made little sense to have separate approval systems.
These requirements dated back to the 1940s, and it was felt that changes in construction and the way in which buildings were used had reduced the effectiveness of the old rules. For example, it was assumed that buildings were only used during school hours, which meant that most schools didn’t require emergency lighting.
As a result, Schools were brought into the Building Regulations, and bespoke guidance was produced – known as BB 100, a design guide for fire safety in schools in England and Wales, which initially came into circulation in 2007. The document provides guidance on how fire safety requirements contained in the Building Regulations can be met when designing a new school or extension. It applies to nursery schools, primary and secondary schools, including sixth form colleges, academies and city technology colleges, and pupil referral units.
From fire doors, cavity barriers, and compartmentation measures to fire alarms and emergency evaluations, a building control approver with the right knowledge and experience working with school construction is required to deliver the best results. We have supported a number of schools across England to deliver safe and efficient buildings that comply with the latest fire safety building regulations. Check out our project at Smythe Library Tonbridge School, where we acted as building control approvers for the redesign and restoration of the iconic Smythe Library at Tonbridge School in Kent by Building Design Partnership (BDP). Read More.



Modern Methods of Construction
Adopting Modern Methods of Construction (MMC) for school projects is becoming increasingly popular. MMC is a form of off-site manufacturing in which much of the construction occurs in a factory facility and is assembled onsite. MMC is typically faster than traditional construction and requires much less onsite time. Both help minimise costs and reduce the risks of accidents onsite.
Like RAAC, MMC is classified as Building Control Class 3 work under the new BSR scheme. Only registered building control approvers at Class 3 level can oversee projects that utilise MMC. An example of a school that used MMC is Immanuel and St Andrews School, designed by MEB architects and using SIPS construction.
Read our Immanuel project as a case study.
Conclusion
Undertaking construction works in schools is best during the school holidays as it helps to minimise risks and cause as little disruption as possible to pupils’ education. However, the type of work that is taking place will require a registered building control approver with the right knowledge, skills, and experience.
We are registered under Class 3 of the BSR scheme, meaning we can take on complex and unusual projects, including those in schools and educational institutions. If you need help with your school project this summer or any other school holiday, then get in touch.
Website: Wilkinson CC