Skip to content
Untitled design (92)

Office-to-Hotel Retrofit

Wilkinson Construction Consultants were appointed as Registered Building Control Approvers (RBCA) for a change of use, 75,000 sq ft (NIA 60,368 sq ft / 5,599 m²) eight-storey office building to 235-key Point A Hotel.

Location: 29 Clements Lane, City of London

Screenshot 2026-05-13 09asdasd

Office-to-Hotel Retrofit

Wilkinson Construction Consultants were appointed as Registered Building Control Approvers (RBCA) for a change of use, 75,000 sq ft (NIA 60,368 sq ft / 5,599 m²) eight-storey office building to 235-key Point A Hotel.

Location: 29 Clements Lane, City of London

Client

images (9)

Architect

Hero-2

Structural Engineers

original

M&E/Public Health

logo (3)

The building, acquired by Queensway Group in 2025, comprised office and retail accommodation across basement, ground, and six upper floors. Prolonged void periods reflected weak demand for secondary office stock in the City — planning documents concluded that, given the building’s quality relative to competing space, re-letting as offices was not viable.

The retrofit-first strategy retains the existing structure rather than redeveloping, supporting the sustainability case (BREEAM Excellent target) and responding to the constraints of operating within a conservation area. The internal retrofit makes the most of the challenging city centre location, with a compact and efficient layout arranged around a new internal atrium that brings natural light into the heart of the building and public walkway below. New bar and lounge areas will bring life to the street frontage, boosting footfall, local spending, and helping reinforce the City of London’s status as a leading global business and leisure destination.

Key design elements are:

  • A new internal atrium delivers daylight into a compact, efficient room layout and into the public walkway below — addressing a classic deep-plan office floor’s limitations for hotel room configuration.
  • Reinstatement of the historic lightwell above Plough Court improves natural light and streetscape usability.
  • Ground floor activation through café/co-working, bar, and lounge uses, including reinstatement of a food and beverage use on the site of the former Red Lion Public House — reconnecting the scheme to local townscape history while boosting footfall and night-time economy contribution.

The scheme is one of several recent City office-to-hotel conversions reflecting the post-pandemic recalibration of secondary office stock, where conversion to alternative use is increasingly favoured over speculative refurbishment for re-letting, particularly where buildings fall short of rising ESG and occupier specification benchmarks.

WCCL have been appointed as Building Control Approvers on this class 3 project, with its unique challenges including the fire strategy implications of introducing an atrium connecting multiple floors, and look forward to the works commencing on site soon.

Untitled design (93)

Kent | London | Essex

Commercial | Domestic | Site Inspection | Consultation | About

Wilkinson Construction Consultants © 2020 – 2026  | Wilkinson Construction Consultants, ® All Rights Reserved.
Registered Address: 52 Grosvenor Gardens, London, SW1W 0AU | Company details: Co Reg No 06808615 Vat Reg No 977 3745 63
D&B D-U-N-S® No 211518835 BSR Registration No RBCP02207N1J

Complaints Policy  |  Data Protection  |  Corporate Social Responsibility  | Terms & Conditions  | Business Policy

Website Design by WE DO MARKETING