Nine years from Grenfell: what Ardmore’s collapse tells us about personal liability
16th June 2026 – by Geoff Wilkinson

The Grenfell Tower Fire happened on 14 June 2017, in the years since, the Building Safety Act 2022 has rewritten the rules on who is responsible for what, and from this autumn the Building Safety Levy will start landing on developers.
On 11 June 2026, MPs held a House of Commons adjournment debate noting that there has been no criminal accountability for those responsible, despite the Metropolitan police confirming it will hand over files to the Crown Prosecution Service in September this year and that the CPS will make charging decisions by the 10th anniversary in 2027. We understand that 20 organisations and 57 individuals could face criminal charges, and potential offences under consideration include corporate manslaughter, gross negligence manslaughter, fraud, health and safety breaches, and misconduct in public office.
However, the effect of the Building Safety Act, and responsibility for the cladding crisis is playing out elsewhere with some significant recent legal developments.
Mostly noticeably in the last week, in a coincidence that does more to illustrate where the industry now stands than any government statement could, Ardmore Construction Group— went into administration. Major sites shut down overnight, more than 500 jobs were put at risk, and clients are now scrambling to find replacement contractors mid-project.
What happened to Ardmore
At the time it went under, the group had a £350m-turnover with around ten major schemes live across the capital, including hotel developments in Mayfair and Kensington and a life sciences campus at King’s Cross.
Nearly a year before this happened, Ardmore Construction Ltd, the original contracting entity behind a number of the group’s older residential schemes, was put into administration on its own. At the time, that looked like an attempt to ringfence the entity carrying the legacy liabilities, let the rest of the group carry on trading and avoid responsibility. It didn’t work, and the reason it didn’t work is the Building Safety Act.
For the purposes of historic defects, two changes in that Act matter more than any other:
- Retrospective extension of limitation periods. Claims under section 1 of the Defective Premises Act 1972 for new dwellings — which previously had to be brought within six years — can now be brought up to 30 years after completion for claims that had already accrued before 28 June 2022, and 15 years for claims accruing after that date. A development completed in 2009, which would have been entirely time-barred by 2015, can now be the subject of a live claim more than three decades later.
- Building Liability Orders (section 130). These allow a relevant liability to be extended from the contracting company to associated companies within the same group, where the court considers it just and equitable to do so, and, as the Crest Nicholson v Ardmore case shows below, the courts are now willing to use them.
Put simply: in 2017, a developer or contractor whose pre-Grenfell work turned out to have serious fire safety defects could, in most cases, expect the limitation clock to have already run out on any claim, and any liability that did exist to sit squarely with the contracting entity and nowhere else. In 2026, neither of those things is reliably true. That is the backdrop against which Ardmore’s restructuring, and its collapse, needs to be read.
The Crest Nicholson judgment
The background goes back a long way. Crest Nicholson was the developer behind 19 residential apartment buildings at Admiralty Quarter in Portsmouth, built by Ardmore between 2007 and 2009. Like a lot of buildings from that period, post-Grenfell investigations found problems with the external walls. Crest took the dispute to adjudication, and on 29 August 2025, the day after Ardmore’s contracting arm went into administration, the adjudicator decided Ardmore had breached its contract and its duties under the Defective Premises Act, and awarded Crest around £14.9 million.
A contracting company in administration obviously can’t pay £14.9 million. So, Crest went after the rest of the group. Two things were asked for: an order extending liability to the associated companies in advance of any final trial finding (an “anticipatory” Building Liability Order), and a second order making those same companies jointly and severally liable for the £14.9 million adjudication award itself. The court granted both, but that’s only part of the story.
“All roads lead to Cormac Byrne”
The part of the judgment that I think deserves the most attention, is what the court said about the man behind the companies.
The judgment recorded that ultimate control of the Ardmore group rested with chairman Cormac Byrne. Cormac had vested his shares in a family trust via a holding company incorporated in June 2024 — a restructuring the court regarded as material to its assessment of whether a BLO was just and equitable. The judge found that the group had been “specifically restructured to ringfence ACL’s liabilities from those of other companies within the group,” that the same director and family trust controlled the group throughout and were aware of the defects, and that without a BLO, Crest would be left with no meaningful recourse.
Crucially, when the Ardmore companies argued they couldn’t be required to pay because of insolvency risk, the judge didn’t accept it. He noted that Byrne had a “reported (and not refuted)” personal fortune, built through the company and other investments, which was — in the judge’s words — “significantly” more than sufficient to enable the group to continue trading despite the obligation to pay. Byrne himself, the judge said, was the “common denominator” across the group of companies named as BLO defendants: Ardmore Construction Group, Ardmore Group, Ardmore Group Holdings, Paddington Construction, Ardmore Fitout, Celebration Homes and Byrne Properties.
It’s also worth noting what the court made of Byrne’s own conduct in the proceedings. He submitted no evidence on the application — while signing the statement of truth on the amended defence — and the judge treated that silence as relevant to how the BLO defendants’ claimed financial position should be weighed.
In May 2026, Ardmore went back to the TCC seeking to delay payment of the £14.9m pending appeal. The judge dismissed all five grounds, awarded Crest interest at 5% from September 2025 and 100% of its costs, and the group’s wider collapse followed within weeks.
What this means in practice
A few things should now be treated as settled, at least until the Court of Appeal says otherwise (Ardmore has been granted permission to appeal):
Putting the contracting entity into administration while the rest of the group carries on, no longer protects that wider group in the way it used to. Furthermore it doesn’t necessarily protect the individual directors behind it either, if the court thinks the corporate veil is thin enough to look through and wealth was built through the company. An adjudication decision against a contractor is no longer something that can be treated as confined to that contractor’s balance sheet, particularly if that balance sheet is empty. And the “just and equitable” test, which sounds vague on paper, is turning out in practice to look hard at things like the timing of restructurings, who actually controls what, whether the people behind a group engaged properly with claims when they were first made, and whether they can back up a claim of financial hardship with actual evidence.
None of this is happening in a vacuum. Anyone who has read the Edgewater case from last year, where the Tribunal made remediation orders against 76 separate respondents, will recognise the same underlying philosophy: the money has to be found somewhere, and the courts are increasingly willing to look past corporate structures to find it.
For developers, freeholders and funders pursuing legacy remediation costs, this is good news, BLOs were a largely untested tool, and Crest Nicholson has shown they work. For contractors, designers and consultants with historic projects on the books, particularly anything pre-dating current fire safety standards, it is a reminder that the gap between “the company’s problem” and “my problem” has narrowed considerably — and that corporate restructuring undertaken with one eye on future claims is likely to attract exactly the judicial scrutiny it was designed to avoid.
Nine years after Grenfell, the industry’s reckoning with historic building safety failures is still working its way through the courts. and Ardmore’s collapse, alongside the Crest Nicholson judgment, suggests that reckoning is now reaching the people who built and controlled these companies, not just the companies themselves. For anyone still holding legacy liabilities behind a corporate structure, that should focus minds considerably.