Navigating product specification in your application for approval
12th August 2025

We’re increasingly being asked questions about product specification and compliance in the wake of the Building Safety Act and the ongoing implementation of the post-Grenfell reforms. While we can’t give specific product advice – that responsibility rests with designers and specifiers – we thought this article might help our clients structure their approach to building control submissions and develop their risk management strategies.
Understanding the Legal Framework
The foundation of good practice lies in understanding Approved Document Regulation 7, which states that “building work must meet the functional requirements of Schedule 1 to the Building Regulations.” Crucially, there is no obligation to adopt any particular solution contained in an approved document to meet these functional requirements. This flexibility means that alternative materials and approaches may be suitable in particular circumstances, provided they can be properly justified.
However, this flexibility comes with responsibility. As the Principal Designer, you are taking accountability for your design and specification choices. You must be satisfied with your decisions and able to justify them not only to the building inspector but also potentially to the Building Safety Regulator (BSR) or even a coroners inquiry should issues arise.
The Hierarchy of Risk: A Structured Approach
When it comes to product specification, there is a hierarchy of risk that designers should understand and navigate systematically. This hierarchy forms the backbone of a sensible approach to specification decisions.
Virtually Zero Risk: The safest position is specifying tested products in strict accordance with their test certificates. When products have undergone rigorous testing and you specify them exactly as tested, you’re operating in the lowest risk category possible.
Very Low Risk: The next tier involves operating within EXAP (Extended Field of Application) guidelines. EXAP allows for reasonable extrapolation from existing test data, providing a structured framework for extending the application of tested systems to similar but not identical situations. This approach maintains low risk while offering practical flexibility.
Increasing Risk Levels: As you move away from tested products and EXAP guidelines, risk naturally increases. However, this doesn’t mean such approaches are automatically inappropriate – rather, they require more careful consideration and robust justification.
When a product forms part of a safety-critical element – whether that’s fire-stopping systems, cladding fixings, or structural supports – the responsibility intensifies significantly. See the RIBA guide to managing Safety Critical Elements
The Real World Challenge
Of course, construction projects rarely follow guidance diagrams perfectly. Refurbishment projects, in particular, can present challenges where the “perfect” tested system simply doesn’t exist. In these situations, success lies in demonstrating a clear, logical process:
Firstly ask whether a tested product exists that could meet your requirements. If one does, and it’s practical to specify it, this should be your default choice. Similarly, if you can operate within EXAP guidelines, this represents sound practice.
If no tested product exists, step back and consider whether your design approach could be modified to accommodate one that does. Sometimes a small design adjustment can move you from a higher-risk to a lower-risk specification category. Where design changes aren’t feasible, investigate whether there’s a track record of the proposed product performing satisfactorily in similar applications. Historical performance data, while not equivalent to formal testing, can provide valuable risk context.
For products without test data or performance history, consider commissioning supporting reports from qualified professionals such as fire engineers. These expert assessments can provide the technical justification needed to support your specification decisions.
If none of the above options are viable, the final step involves conducting a first-principles risk assessment. This should evaluate both the probability of failure and the consequences of that failure. Low-risk scenarios may justify proceeding, while high-risk situations should prompt reconsideration of the entire approach.
Insurance and Practice Considerations
Given the increased scrutiny and potential liability associated with specification decisions, it’s worth discussing these issues with your professional indemnity insurer. Many practices are developing internal practice notes or procedures to help ensure consistent, defensible approaches to product specification.
These practice documents can help establish clear protocols for different risk scenarios, ensuring that all team members understand when additional approvals, expert input, or alternative approaches might be required.
Moving forwards
This new building safety regime isn’t about stifling creativity or drowning designers in bureaucracy. It’s about rebalancing freedom with responsibility – ensuring that when something matters to building user safety, we can demonstrate not just what we did, but why and how we did it.
The temptation in such an environment is to chase absolute certainty. But the truth is, certainty in construction is rare.
Instead when making an application show Building Control that you’ve:
- Considered the available options
- Weighed the associated risks
- Sought appropriate expertise where needed
- Maintained meticulous records throughout
This approach is far more likely to result in supportive engagement rather than regulatory obstruction.
As building control professionals, we’re here to support projects through this landscape, not obstruct them. If you’re grappling with product specification challenges or need guidance on structuring your submissions, we encourage early engagement. The earlier these conversations happen, the smoother the process becomes for everyone involved.
Remember, we can’t advise on specific product choices – that professional responsibility rests with you. But we can help you understand what evidence and processes we need to see to support your applications effectively.