Client
Private Client
Designer
Kirkland Fraser Moor
Project Manager
Trunk
The scheme by Kirkland Fraser Moor for this sensitive rural location in Essex is based on contemporary bespoke Passivhaus design with large basement for private client. Passivhaus or ‘Passive House’ is the fastest growing energy performance standard in the world, though relatively few have been built in the UK, according to NHBC figures as at July 2012, the number of Passivhaus buildings in the UK either completed or under construction stood at a relatively modest 165 compared with over 20,000 in Germany.
The Passivhaus standards strengths lie in the simplicity of its approach; build a house that has an excellent thermal performance, exceptional air-tightness and mechanical ventilation/heat recovery. The Knights Hill scheme for example utilises Insulated Concrete Formwork (ICF) and has a design air-tightness of 0.6 ach compared with current building regulations that allow a leaky by comparison 10 ach.



Kent | London | Essex | West Sussex
Commercial | Domestic | Site Inspection | Consultation | About
Wilkinson Construction Consultants © 2020 – 2022 | Wilkinson Construction Consultants, ® All Rights Reserved.
Registered Address: 52 Grosvenor Gardens, London, SW1W 0AU | Company details: Co Reg No 06808615 Vat Reg No 977 3745 63
D&B D-U-N-S® No 211518835 Approved Inspector Building Control CIC Licence No 153
Complaints Policy | Data Protection | Corporate Social Responsibility | Terms & Conditions | Business Policy
Website Design by I DO MARKETING