Measured in accordance with Approved Document B, the building’s height is below 18 metres and, as a hotel, it therefore fell outside the mandatory requirement for non-combustible materials in the external wall system under Building Regulation 7(2). However, an intrusive survey identified the external wall construction combined several combustible elements with an incomplete cavity barrier installation, which the client wanted rectified to reduce risk. As the building falls outside the Higher-Risk Building definition, the project was able to proceed through the private sector RBCA route, allowing the programme to be delivered efficiently while the hotel remained operational.
The works included full replacement of the ACM PE rainscreen with A1/A2 rated cassettes, concurrent replacement of the phenolic foam insulation with mineral wool, and cavity fire barriers to all floors, compartment lines, doors and windows.
With the high-risk areas of the façade now comprehensively remediated, the hotel’s “double knock” alarm protocol has been reinstated, and when assessed against the procedures set out in PAS 9980:2022, the external walls now achieve a LOW level of life safety risk, giving 4C Hotels a robust, building-control-verified compliance record to support their ongoing insurance, financing and fire safety obligations.







Kent | London | Essex
Commercial | Domestic | Site Inspection | Consultation | About
Wilkinson Construction Consultants © 2020 – 2026 | Wilkinson Construction Consultants, ® All Rights Reserved.
Registered Address: 52 Grosvenor Gardens, London, SW1W 0AU | Company details: Co Reg No 06808615 Vat Reg No 977 3745 63
D&B D-U-N-S® No 211518835 BSR Registration No RBCP02207N1J
Complaints Policy | Data Protection | Corporate Social Responsibility | Terms & Conditions | Business Policy
Website Design by WE DO MARKETING