Changing Principal Designer or Principal Contractor
14th July 2025

The Building Safety Act has been in for quite some time now and we have seen an increase in the number of clients who have decided or been forced to change Principal Designer or Principal Contractor.
In the past this was a simple enough process, but there are now strict legal rules you must follow. This blog helps explains what you need to do.
What are these roles?
Firstly, just a reminder that it is now a legal requirement to appoint a principal designer and a principal contractor on every project you have with us no matter how small. These appointments must be made in writing as these are important legal roles with specific duties.
Before appointing someone, check they have the right skills and experience. They need to understand building regulations and have the resources to do the job properly.
This is a legal requirement under Regulation 16C. The British Standards Institute has published guidance to help with this:
- PAS 8671 – competence requirements for Principal Designers (PD)
- PAS 8672 – competence requirements for Principal Contractors (PC)
For more see attached PDF guide
Try to Avoid Changes
Changing these roles during a project creates problems. It’s much better to:
- Choose the right people from the start
- Check their track record and financial stability
- Set clear expectations in contracts
- Monitor their performance regularly
What is the process if things do need to change?
No matter how hard you try to avoid the issue, we understand that sometimes change is unavoidable so what is the process to make that change?
Step 1: The client should formally terminate the existing appointment and appoint the new person in writing.
Step 2: Make sure you notify us about the change as we will need to amend the Initial Notice – there is a small charge for this
Step 3: The outgoing PD or PC must write a formal handover document – this must be done within 28 days of the change (see link for example handover documents produced by ChatGPT)
Step 4: The new PD or PC needs to fully review the handover
Your contracts should include specific rules about these rules and what happens if you need to change these roles. This is especially important if there might be disputes or financial problems.
Include these in your contracts:
- Clear handover requirements with deadlines
- Penalties if handover is late or incomplete
- Requirements to keep good records throughout the project
- What happens if someone becomes insolvent
- Insurance to cover any gaps in service
What happens when the PC or PD changes?
It is important to act professionally and ethically in this situation as there are legal and contractual penalties for non-co-operation. In particular make sure that you share all important information about the project, including plans, design intents, construction methods, photographic records, and compliance documents.
What the Client Must Do
During any change, the client must:
- Keep the project running smoothly
- Make sure everyone works together
- Give the new person all the information they need
- Check that building regulations are still being followed
What the Outgoing Person Must Do
If you are the outgoing Principal Designer or Principal Contractor, you have a legal duty to help with the handover. You must give the client a written document that explains:
- How you managed the project
- What systems you put in place
- Any risks or problems that still need attention
Important: You have exactly 28 days from when your role ends to provide this document. This is the law, not a guideline.
What the Incoming Person Must Do
The new Principal Designer or Principal Contractor must:
- Work with the existing team
- Review the document and check what’s been done so far
- Review what work the previous person did
- Check that everything meets building regulations
- Fix any problems you find
- Make any changes needed to follow the rules
- Share information with other people on the project
Handover Documents
Click below to download our handover document examples for both Project Contractors and Project Designers: