Building Control Reform: What the Government’s Recent Announcement’s Tell Us To Expect
22nd July 2025

The government’s latest announcement on water sector reform offers fascinating insights into how ministers are thinking about public versus private ownership across regulated industries. For those of us watching the Building Control (BC) sector review unfold, the contrasting approaches to railways and water companies reveal a pragmatic strategy that could well shape the future of building regulation in England.
Two Sectors, Two Strategies
The government’s approach to bringing key infrastructure back under public control has been notably selective. While Transport Secretary Heidi Alexander announced decisive action to nationalise South Western Railway and c2c when their contracts expire in 2025, Water Minister Emma Hardy has taken a markedly different stance on water companies.
Speaking to Sky News Breakfast, Hardy was refreshingly blunt about why nationalisation of water companies is off the table: “I’d end up having a legal row with lots of water companies for the next few years. They’ll immediately pull the investment because why would you invest in a water company if you think that’s just going to be taken over?”
Her pragmatic reasoning extends beyond just legal battles. “I haven’t got the money to be in a fight with lawyers for years,” Hardy admitted. “I’m a pragmatist. I’m focused on what the public wants, not on whichever model it is that people are shouting for.”
The BSR Crisis: A Cautionary Tale
Importantly this debate is taking place against a backdrop of serious systemic failures within the current regulatory framework. The Building Safety Regulator (BSR) struggles with massive backlogs, whilst resource shortages in Local Authorities have meant several councils reducing inspection levels or even declining any new applications. All of which provide a stark warning about the practical challenges of implementing regulatory reform without addressing fundamental capacity issues.
Recent data reveals a system in severe distress, with over 1,019 open applications as of March 2025 and average processing times for new-build projects now reaching 36 weeks – three times longer than the original 12-week target. Of the applications processed, 50% of existing building applications and 45% of new-build applications were rejected for failing to comply with building regulations. Only 15 out of 193 new-build high-risk building applications have successfully navigated the approval gateway since the system launched.
The resource crisis runs deeper than simple understaffing. Industry experts report that the BSR has “struggled to recruit people” and has been “short-staffed and under-resourced” since its inception. The regulator’s reliance on multidisciplinary teams hasn’t delivered the expected support, with officials now admitting “the MDT approach isn’t working as we’d hoped.”
The withdrawal/collapse of private building control firms AIS Surveyors, PWC and Assent Building Control last autumn, handed hundreds of in-flight applications back to an already overwhelmed BSR, and further exacerbated the crisis. This transferred burden highlighted the fragility of a system already operating at capacity limits, and the risks of adding large swathes of work reverting back from the Private Sector.
The economic impact is also spreading beyond delayed projects. Banks are stepping back from high-rise residential development, with one spokesperson stating: “With these delays holding up projects, we’ve reassessed our risks and, like other banks, are stepping away from the high-rise residential market. There are simply easier, less risky investment options elsewhere.” If the Government want to keep housebuilding alive and to deliver anywhere near the promised 1.5 million home target they cannot afford to get this wrong.
The Cunliffe Report: Ownership Isn’t Everything
The philosophical foundation for the water sector reforms comes from Sir Jon Cunliffe’s comprehensive review of the water sector. His key finding cuts through decades of ideological debate: “There is no clear relationship between ownership models and outcomes.”
This conclusion is profound in its simplicity. Cunliffe’s analysis reveals that both public and private systems can deliver excellent or poor results depending on how they’re structured, regulated, and managed. The quality of oversight, regulatory framework, and accountability mechanisms matter far more than whether a service carries a public or private logo.
Implications for Building Control Reform
Option 1 – Nationalise
Should the government apply the railways approach to Building Control, and nationalise the supply chain, then any major structural changes would need to align with existing contractual arrangements. The vast majority of Registered Building Control Approver (RBCA) licenses don’t expire until April 2029, creating a natural timeline for any comprehensive reform.
This four-year runway would avoid a hard stop but could still trigger the same investment flight and legal challenges Hardy warned about in the water sector.
Option 2 – Reform
The more likely scenario emerging from current policy signals points toward regulatory reform creating a single national body rather than wholesale ownership transfer in the supply chain. However, the BSR experience demonstrates that creating new regulatory architecture to run projects without adequate resources and clear operational frameworks risks system failure.
A reformed Building Control system must learn from the BSR’s struggles. This could manifest as a single national regulator with enhanced powers to:
- Enforce regulations consistently across both public and private providers with adequate staffing levels
- Monitor performance standards with real teeth, meaningful sanctions, and proper resource allocation
- Ensure accountability through transparent reporting and public oversight backed by competent professional staff
- Prosecute failures effectively when safety standards are compromised, without bureaucratic delays
One of the most intriguing possibilities within this regulatory approach is the clear separation of enforcement from application processing. Currently, this dual role creates inherent conflicts of interest and capacity constraints within local authorities.
A reformed system could liberate local authorities to compete on equal terms with private sector providers for application processing, while a dedicated national enforcement body ensures standards are maintained regardless of who processes the applications, achieving Dame Judith Hackitt stated aim to stop people choosing their own regulator.
Pragmatism Over Ideology
The government’s water sector approach suggests a mature recognition that effective regulation matters more than ownership structures. This pragmatic stance could serve Building Control well, particularly given the sector’s critical role in public safety and the complex technical challenges it faces.
Rather than getting bogged down in ideological battles about public versus private provision, the focus must shift to creating robust systems that deliver results. This means stronger oversight, clearer accountability, meaningful sanctions for failure, and genuine competition where appropriate. For a sector where public safety is paramount, this approach offers the promise of better outcomes through better systems rather than simply different ownership models.
The government’s approach to regulation is now becoming clear: fix the system, strengthen oversight, and let performance rather than ownership determine success. For Building Control, this must be delivered not through ideological revolution but through practical, evidence-based improvement.
As Hardy put it, the focus should be “on what the public wants” – which, in Building Control’s case, is safe buildings delivered efficiently through properly regulated systems, regardless of who owns the companies providing the service.