Building Control Fees
14th May 2025

How to get a quote
The introduction of the new regulatory framework under the Building Safety Act has brought significant changes to the way Building Control services are delivered across the country.
One area that continues to generate questions is the length of time it now takes to get a quote, the level of information required, and the variations in cost for similar projects.
Length of time
Historically it was fairly easy to obtain a building control quotation and we had standard fee scales for many typical projects.
However, the introduction of the Building Safety Act has changed that. In the past each inspector typically had a their own geographical area and picked up all the work in that area. It was a fairly simple process to review workload and offer a quotation.
However under the new competency rules, we can no longer allocate the “nearest available surveyor” to a project. Instead, we must assign the nearest surveyor who holds the appropriate level of competency for the type and complexity of work involved. This is not simply a matter of best practice—it is a regulatory requirement designed to ensure that only suitably qualified professionals are undertaking or overseeing work that meets statutory expectations.
This has seen demand (and therefore salaries) for the most qualified inspectors rocket, in some cases almost doubling since April 2024. As a result, where a scheme is located in a more remote area or falls into a specialist category, travel and time commitments can vary significantly. If there is no appropriately competent surveyor based nearby, a qualified team member may need to travel from further afield. This naturally impacts the resourcing model and contributes to the overall cost of service delivery.
Where a surveyor is in the process of developing or upgrading their registration class then they can be used, under supervision by a qualified inspector. This requires time, planning, and the involvement of more than one surveyor, all of which must be factored into the project cost.
As a result there are several resources implications now have to be factored into the fees we quote, which adds time to the process.
Level of information required
Prior to the Building Safety Act changes the level of information required to quote was often limited to the address and a description of works. Now the list of information we need is much longer.
To help us process your quote as quickly as possible, here’s a handy guide to the key details we need, and why they’re important.
Description of Works
Firstly, and most importantly we need a clear description of the works being proposed. This helps us determine which works we need to check and the level of resource required. For example, are you altering a structure? Changing how a space is used? Installing a new system? Each type of work can trigger different requirements.
Often this is simply described as new extension or internal alterations. However, this is not clear and for example a single storey extension is different from a two storey wrap around extension. Problems can arise if works are not accurately described for example if the works include changes to external cladding or replacement windows that is not covered by the initial description. Another example is applying for a simple domestic extension, and not explaining that you are also proposing to change the use to a HMO.
Use of Building
Due to the RBI classifications we need to know the use of the building as existing and as proposed. A large number of inspectors are only licensed to undertake residential works so if the building contains (or will contain) non-residential uses only inspectors from Class D and above can be used.
Height of the Topmost Storey
We also need to know the height of the topmost storey of the building, in particular is it less than 7.5m, less than 11m or more than 18m, as again the inspectors classifications are based on height as well as use. This measurement refers to the upper floor surface of the highest storey intended to be occupied. It can also includes rooftops where plant (like air handling units or other equipment) is installed and accessed, or used as a rooftop garden.
Importantly this information needs to be about the entire building not jus the part you are working on. So although you may be undertaking an office fit out on the ground floor, the complexity will be determined by the overall building height, so if that building is over 11m it will require a class 2F inspector.
Number of storeys
If the building contains dwellings we will need to make a check of the High Risk Building (HRB) register to determine if the building is (or should be) registered as a HRB. Importantly it is often forgotten that in additional to the rule that the building should not exceed the 18m limit, it can also be considered a HRB if it has 7 Storeys above ground. This definition can include “semi basement” stories or lower ground floors on sloping sites.
Cost of Works
We’ll also ask for the estimated cost of the works. As part of our annual insurance renewal we are required to declare the build costs of projects we have worked on. This gives the insurer a context for the scale of the project and can help inform the approach to assessments and risk levels. Whilst we appreciate that the exact cost is unlikely to be known we will need a ballpark figure to enable us to quote.
Location
As explained above we need to know the location of the project in order to be able to quote as this affects the distance that the inspectors will have to travel. Ideally please provide a location plan as sometimes addresses can be difficult to locate – especially on a new estate.
Duration of Works On Site
Knowing how long the works are expected to last allows us to plan the number and timing of inspections. Some projects need just a few key checks—others may need regular site visits over many months. By understanding your timeline, we can make sure we’re there when you need us.
Construction Type
We will need to understand the proposed construction method or in the case of existing buildings how the original building was constructed. This helps us identify potential limitations, risks, or requirements that may not be obvious from your new work alone. Importantly certain types of “non-standard” construction will require a class 3 Inspector to be allocated to the project.
More detail on these definitions can be found here, but don’t worry—we’re happy to help clarify if you’re unsure which your building falls under.
Duty Holders
Under the Building Regulations, three key duty holders must be identified:
- The Client – usually the building owner or person commissioning the work.
- The Principal Designer – responsible for planning, managing, and monitoring the design work.
- The Principal Contractor – responsible for managing the construction phase.
We ask for this information as it’s important that everyone understands at an early stage who will be undertaking these roles. Whilst it is not a legal requirement to name them at the quote stage it does help us to understand the approach to assessments and risk levels. For example, we would generally decline projects where the client is planning to take all 3 roles, unless they could demonstrate that they have the necessary experience, and qualifications to undertake those roles. In the case of the Contractor, we also need to check the Responsible Actors Scheme and Prohibitions list to determine if there are any current sanctions.
Variation in cost
As we have seen above there are several factors that need will affect the hourly rates and travel costs (and even our ability to service the project) which will mean that seemingly similar projects may now have significantly different fees applied. Therefore its important to engage early to be able to get a realistic cost, especially with the significant inflationary pressures on salary.
As things change frequently we are now also limiting the time that the fee quote remains open so if you have previously had a fee quote and have not yet appointed please look to appoint early to lock in the price quoted.
In our next blog we will look at the information required in order to serve the initial notice.