Appoint Early to Save Money
17th January 2024

Don’t delay – appoint Building Control today.
Our clients often say they are not ready to appoint us yet as they are waiting for planning permission. This can be a false economy, as getting Building Control (BC) involved early can help save huge amounts of money and time.
A survey conducted by KPMG found 69% of construction projects were over budget by more than 10%. Even if you allocate proper time and resources for accurate budget and schedule estimates in the preconstruction planning stage, if your design plans are defective, you’ll inevitably be destined for cost overruns in construction projects. A design deficiency is a poorly designed, inaccurate or incomplete plan.*
When to get Building Control Involved
Traditionally, clients left BC approval until RIBA Stage 4 (e.g. after they obtained planning consent) as they considered the Building Control fee to be wasted if planning permission was not secured. However, this approach led to many potential issues, especially related to fire safety, being left too late. There have been many cases where planning consent was obtained without considering Building Control issues. As a result, when the BC application was eventually made, changes to elevations, layout or materials were required, which meant going back to planning with amendments. The outcome resulted in increased costs and delays due to extra design fees and a resubmitted planning application.
To avoid this, the Building Control system was updated in October, and there is now an expectation that BC will be appointed before planning, as recognised in the updated version of the RIBA plan of work for fire safety (extract below). As you can see, the recommended time to appoint Building Control is now at RIBA Stage 2 prior to obtaining planning consent, and we have even worked with clients to provide a supporting report at the planning stage saying that we had checked the plans and that they were capable of approval under the regulations. Increasingly, we are seeing Planning Authorities wanting this sort of reassurance prior to issuing consent.

When it goes wrong – Case Study: £40k loss
We were recently contacted by a client who was planning an Airspace development and had already spent eight months and £40,000 on professional fees to get through the planning stage. When they finally thought about Building Control, they discovered they needed sprinklers and other safety measures, meaning the project didn’t stack up and was no longer commercially viable.
Appointing Building Control before submitting your planning application can highlight requirements you have yet to consider or be aware of.
With the above example, they spent a lot of time, money, and resources to get planning permission and did not consider all the building regulation requirements. If we had been appointed before they made the planning application, we could have checked their plans and made them aware of the requirements. This would have allowed them to make an informed decision on whether the project was viable, saving them tens of thousands of pounds on professional fees.
Added Value
Don’t make the same mistake. Make sure you appoint a Building Inspector early. Don’t wait until you invest heavily in getting planning permission on a project you may never be able to build if it does not comply with regulations.
Benefits of appointing a Building Inspector early:
- They save you time & resources
- They can share their knowledge and experience
- They identify any potential problems
- They provide advice on what information is required and what regulations will apply
- They provide signposting to potential solutions.
In this current climate, every penny counts. Building and construction are already costly, so if you can save time, money and effort during the process, it is worth taking action now. This is the value of a Building Inspector.
How we work with Architects and Designers
We are involved throughout the process: from pre-application meetings and guidance, tender and construction phase plan checks, through site inspections and certification stages. We are there with you all the way, and you will get copies of our tracking reports and copies of the site reports so there are no shocks along the way; plus, our objective and expert guidance can save you time and money.

Building Control should not be seen as another tick box. We can really add value to your project, and the earlier we are appointed, the better. Don’t be another case study of what not to do; we want to help make the process of Building Regulation compliance as smooth and hassle-free as possible. Getting us involved in the process early on means we can identify any potential issues and suggest solutions.
Don’t think you know the regulations – speak to the experts!
Get in touch with us today to discuss your project at whatever stage you are at:
T: 01732 523466
E: office@wilkinsoncc .co.uk
Sources:
* https://constructionblog.autodesk.com/common-construction-cost-overruns/
Building control charges: another cost for building projects, and a postcode lottery for clients
Building projects are facing another change in the way building control is funded. Following the introduction of the Building Safety Levy on 1 October 2026, the Government is widening the range of functions for which local authorities can charge for their building control services.
A proud moment for Wilkinson Construction Consultants – Best Registered Building Control Approver 2026
We’re delighted to share that Wilkinson Construction Consultants has been named Best Registered Building Control Approver 2026 – UK at the SME500 UK Awards.